Coffer Dam

The Pallet Barrier, can be used as a coffer dam and erected in turbulent water. In this case, to drain a branch of a river, for bridge repair work. It was erected in 0.6 meter high fast flowing water. After having established the barrier, the water rose to 1.25 metres. During the 3 months it was up, the barrier was overtopped 4 times but still kept the stability.

 

    References:

  • Atkins Construction, Frome, 30 January – 3 May, 2002
  • Morrison Construction, Stourport on Severn, 25 July – 12 September, 2002
  • Edmund Nuttall Ltd, Littleborough, 4 Sepember - …, 2002
  • May Gurney Braintree, November 2002 - January 2003
  • Interserve – Hebden Bridge, December 2002 - Februari 2003
Shebdon (2003-01-14 - 2003-01-16)